HVEA’s team was selected for the NYSDOT Term Agreement to provide Highway Safety Investigation Services in Region 8. This work includes the investigation of approximately seventy-five (75) highway safety investigation (HSI) locations which are state highway segments, approximately three-tenths of a mile in length where the incident rate exceeds the average for that highway type. The HVEA Team will evaluate each HIS locations and will perform a comprehensive analysis to determine what may be contributing to these increased accident rates and will make recommendations for improvements.
HVEA was selected as a prime firm by the NYSDOT to provide construction inspection services for this Bridge Maintenance By Contract project. With a construction value of $10M, this contract includes the replacement/repair of bridge components including bearing replacement, structural steel repair, armor joint removal/replacement, deck wearing surface repair/replacement, structural steel painting, and bridge rail replacement.
NYSDOT selected the E.E. Cruz & Company, Inc./Hardesty & Hanover/HVEA Engineers team for D900036, Region 8 Bridge Replacement Design-Build project. HVEA Engineers, as the prime construction inspection firm, will be responsible for leading the construction inspection services for this $70 million design-build bridge replacement project which includes the following structures:
- BIN 5500050, East 3rd Street Bridge over the Hutchinson River & the Hutchinson River Parkway. A concrete tee beam, this structure is located in Pelham and Mt. Vernon.
- BIN 55500719, NYS Route 987D over the Saw Mill River. A concrete arch located in the Town of Greenburgh.
- BIN 5500739, NYS Route 987D over the Saw Mill River. A concrete tee beam located in the Town of Greenburgh.
This project is expected to be completed April 2019.
HVEA was awarded our first Bridge NY Funded project through a qualifications based selection. For this $2.9M project, HVEA is providing the preliminary and final design services for the Replacement of the Hillside Avenue Bridge over the Mamaroneck River, PIN 8761.55. This replacement project will follow the Procedures for Locally Administered Federal Aid Projects and has an accelerated schedule requiring an 18 month construction start date in order to meet the Bridge NY requirements. Services include: bridge replacement design, hydraulic analysis, scour protection, multi-agency coordination, SHPO coordination, ROW acquisition, and construction support and inspection services.
The NYSDOT has selected the Design-Build team of Yonkers Contracting Company, Inc./HNTB/HVEA Engineers for the Route 17 at Route 32 (Exit 131) Reconstruction project. HVEA Engineers, as one of the prime firms on this team, will be responsible for leading the construction inspection and material testing services for this $125 million reconstruction project. The primary goal is to reconstruct the Route 17 interchange to meet interstate standards which will include the following:
- Construction of a grade separated access point to and from Woodbury Common Premium Outlet Center
- Reconstruction of Exit 131 eastbound ramp system
- Reconstruction of Niniger Road (CR 64) and the Exit 131 westbound ramp system
- Reconstruction of Route 17 from US Route 6 deceleration lane (Ramp B) and the westbound Route 6 flyover acceleration (Ramp A) to the Harriman Toll Plaza
HVEA Engineers is pleased to be a key player on this design-build project. This multi-faceted in-depth project has an aggressive construction schedule where we expect to be running double shifts to meet the December 2019 anticipated completion date.