Metro-North Railroad: Harmon Shop Replacement
This design-build project is being completed by ECCO III Enterprises, along with joint venture partner Skanska USA Civil Northeast, with Jacobs Engineering-Parsons Brinckerhoff JV as the designer.
HVEA is performing on-site testing of concrete, nuclear density testing of compacted fills, and a variety of laboratory services including concrete trial batching and compressive strength testing of concrete.
Valued between $200-300 million, the Harmon Shop Replacement Phase V – Stage I Project replaced a portion of the current Harmon Main Shop (Building 6) with a new state of the art Consist Shop Facility. The work included a retrofit of Building 6, asbestos and lead abatement, demolition of the Blowshed Building, demolition of the existing Recycling Center Facility and finally, bifurcation and partial demolition of Building 6. The Design-Build team designed and constructed the Consist Shop Facility with provision for connection to the Stage 2 contract for the construction of a new Running Repair and Support Shop Facility.